How long does “Production” take?

radar3d
Aug 21, 2022

Rank VI

Aug 21, 2022

2945192F-B0EC-4AE2-928D-08BC9E2C2747.jpeg
In Production, should be done by now.
22 | Badlands | Cyber | NonSAS | MIC | 2.7 Auto | Lux | Leather | Tow |
Res: 07/27/2020, Order: 11/04/2021, Sched: 8/8, Re-Sched: 8/15, In-Prod: 8/15, Blend: 8/19, Mods: 8/23, Chip Hold: 9/29, Built: 10/3, Ship: 10/4, Train #: 10/5, Delivered: 10/20.
CBWAR1, TK1215
Last edited by a moderator: Aug 21, 2022

Rank VI

Oct 04, 2022

#20
0400 today after 7 weeks “In Production”

86D9A47F-61C9-48B6-B219-D52342CB5A47.jpeg
22 | Badlands | Cyber | NonSAS | MIC | 2.7 Auto | Lux | Leather | Tow |
Res: 07/27/2020, Order: 11/04/2021, Sched: 8/8, Re-Sched: 8/15, In-Prod: 8/15, Blend: 8/19, Mods: 8/23, Chip Hold: 9/29, Built: 10/3, Ship: 10/4, Train #: 10/5, Delivered: 10/20.
tlowell01

Rank V

Oct 04, 2022

#21
Until the day after delivery in my case. Got a surprise email from my dealer that it was there. Tracker showed "In Production" after I picked it up....
'21 AMB Basesquatch 2 Door. 2.7. 569 days from reservation to delivery
radar3d