My bronco is in production since a day or so. How long now?

Mdbeachguy
Mar 22, 2022

Rank VI

Mar 22, 2022

I know there is a giant yard at ford filled with broncos that need chips , but didnt they say the newer production ones are skipping a bunch of chips a week or two ago?

Anybody know if the newer factory to dealer process is going to be quicker? or am i going to be on bronco mountain for months?
Last edited by a moderator: Mar 22, 2022

Rank VI

Mar 22, 2022

#1
That's an easy one. It takes 1 - 3 days to build and then somewhere between 30 - 180 days for delivery, give or take six months.
2022 Jeep JLR, manual with even more extra guacamole
Sold - 2021 Jeep JLR, manual w/extra guacamole
ResidualGenius, Ditchrunner

Rank VI

Mar 22, 2022

#2
That's an easy one. It takes 1 - 3 days to build and then somewhere between 30 - 180 days for delivery, give or take six months.

But I've heard if you're a Jeep lover hanging around Bronco forums... They send you directly to Exile Mountain and say it's missing a chip ;)
2021 Broncos - BaseSquatch 4dr. Rapid Red V6 Soft Top
Big Bed 4dr. AMB V6 Soft Top Tow (BIL's)
Nitto tires SUCK! You've been warned.
jimFish, ResidualGenius

Rank VI

Mar 22, 2022

#3
anybody else have ideas?

Rank 0

Mar 22, 2022

#4
I feel I’ve been lucky with things moving fairly smooth with my order. The length between in production and built was waiting on a chip(s). That was what my dealer shares with me anyway. I still think 2-3 weeks for delivery since I’m out in AZ. The tracking sight updated to shipped last night. Hope this helps.

Attachments

Shawn_1121

Rank VI

Mar 22, 2022

#5
I feel I’ve been lucky with things moving fairly smooth with my order. The length between in production and built was waiting on a chip(s). That was what my dealer shares with me anyway. I still think 2-3 weeks for delivery since I’m out in AZ. The tracking sight updated to shipped last night. Hope this helps.
you think the new production ones are going to skip chips and make it faster?

Gladesmen

Mar 22, 2022

#6
you think the new production ones are going to skip chips and make it faster?
"Skip Chips" you mean the news that Ford will ship Broncos without certain chips, to be installed at a later date?
The new ones that are skip chips will probably be sent out and not to Bronco Mountain in theory but if that is what is actually going to happen Know one knows and Ford ain't telling. so as much of a joke our friend @AcesandEights was making there is probably just as much truth to it.
Bronco Nation 1100. Everglades, Desert Sand
Res: 7/30/20 ordered 1/22/21 reorder 10/15/21 changed to Everglades 3/9/22 schedule 8/29/22 bumped to 9/5; 9/7/22 blend, 9/9 Mods, 9/26/22 completed, 10/7 shipped, 11/3/22 delivery

Rank 0

Mar 22, 2022

#7
I would hope not, I think that would be a poor move on fords part. They have already had enough craziness with the release of this vehicle.

Rank VI

Mar 22, 2022

#8
I would hope not, I think that would be a poor move on fords part. They have already had enough craziness with the release of this vehicle.
what do you mean?
NavPatriot, AcesandEights

Rank III

Mar 23, 2022

#9
I have been "in production" for almost 2 months so its a crap shoot......
Omac08

Team F Cancer!!

Mar 23, 2022

#10
you think the new production ones are going to skip chips and make it faster?
FMC can't even figure out the MIC top or 2.7 issues so sending Broncos out without chips would be a disaster in the making and will easily take them 12-24 months to resolve if sent incomplete and then when you have an issue with the installed chip is that FMC's fault or does FMC leave it to the dealer sine they installed that part??
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered

Rank VI

Mar 23, 2022

#11
FMC can't even figure out the MIC top or 2.7 issues so sending Broncos out without chips would be a disaster in the making and will easily take them 12-24 months to resolve if sent incomplete and then when you have an issue with the installed chip is that FMC's fault or does FMC leave it to the dealer sine they installed that part??
what 2.7 issues? the only issues i have heard of are on the b6g forum and thats only 46 vehicles
Shawn_1121

Team F Cancer!!

Mar 23, 2022

#12
what 2.7 issues? the only issues i have heard of are on the b6g forum and thats only 46 vehicles
Check the threads here, no clue the number but since the 2.7 has been around one would think there shouldn't be any but all the failed ones are under 5,000 miles
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered

Rank IV

Dec 07, 2022

#13
How long from in production to built?
Moderator

Life is a Highway

Dec 07, 2022

#14
How long from in production to built?
It just depends on if you have any extras being put on or if there are any parts holds. It could be anywhere from a few days to a couple of weeks. And if there is a hold it could be months before it is released to ship
jimFish, Deano Bronc

Rank III

Dec 07, 2022

#15
How long from in production to built?
Mine was built 11/17/22 shipped 11/18/22 and is sitting in a rail yard waiting to be trucked to the dealership about 60 miles. So close but yet so far!!
jimFish, JIOxfordWhite
Moderator

Life is a Highway

Dec 07, 2022

#16
Mine was built 11/17/22 shipped 11/18/22 and is sitting in a rail yard waiting to be trucked to the dealership about 60 miles. So close but yet so far!!
Mine was built 11/17/22 shipped 11/18/22 and is sitting in a rail yard waiting to be trucked to the dealership about 60 miles. So close but yet so far!!
That is service!
jimFish, Deano Bronc

Rank V

Dec 07, 2022

#17
Six days in a rail yard six miles from the dealership. Any day now maybe
2022 4dr Badlands~Cyber Orange~MIC Top~Non Sas~2.3l MT~High Package~Roof Rails~Block Heater~Ordered 1/13/22~Build date 11/3~ In production 10/26~Window sticker 10/27~11/3 Blend date~Modules live 11/4~built email 11/6~shipped 11/14~arrived at the dealership 12/13~in the home stall 12/15
jimFish, Touron

Gladesmen

Dec 07, 2022

#18
Mine was in production 9/5/22 with a blend date of 9/7/22 it was completed 9/26 then sat for a month looking for a train ride. It arrived in SATX 10/31 picked it up on 11/03/22
My brothers was about 2.5 weeks delivered to the same place. So your mileage may vary.
Hope it is not too much longer.
Bronco Nation 1100. Everglades, Desert Sand
Res: 7/30/20 ordered 1/22/21 reorder 10/15/21 changed to Everglades 3/9/22 schedule 8/29/22 bumped to 9/5; 9/7/22 blend, 9/9 Mods, 9/26/22 completed, 10/7 shipped, 11/3/22 delivery
TK1215, Deano Bronc

Rank 0

Dec 07, 2022

#19
Built 11/18 shipping est of 12/1-12/7, have heard nothing!