First/Last VIN 2021

Charley
Oct 23, 2021

Rank V

Oct 23, 2021

This came up in another thread, but rather than continue that tangent figure start a new thread.

I imagine the earliest VIN would be A00000, anyone have one close to that?

As for the last VIN, anyone know? Post up your late VINs

Mine is B07699, scheduled for 11/29, 4dr BL, MT, ST, high pkg

I’m sure there are later VINs, whatcha got?
Jakob1972, ResidualGenius
Last edited by a moderator: Oct 23, 2021

Libations MOD

Oct 23, 2021

#1
interesting, so if Ford actually did 7,000 FE's then only 699 others were built from your VIN date. 7,000 sounds more and more like :poop:
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered

Rank V

Oct 24, 2021

#2
This came up in another thread, but rather than continue that tangent figure start a new thread.

I imagine the earliest VIN would be A00000, anyone have one close to that?

As for the last VIN, anyone know? Post up your late VINs

Mine is B07699, scheduled for 11/29, 4dr BL, MT, ST, high pkg

I’m sure there are later VINs, whatcha got?
I'm in the A41000 range. Assuming that makes me in the 41,000 unit produced range. I have a FE.
https://youtu.be/9jB7-0QehTE
Rgwinn

Rank III

Oct 24, 2021

#3
I am a Dec 6 build, but have B02179
Rgwinn

Rank VI

Oct 24, 2021

#4
I'm in the A41000 range. Assuming that makes me in the 41,000 unit produced range. I have a FE.

No, A4 seems to be unique to the 4-door First Editions, so, you have the 1,000th 4 door produced, my FE is A42350;
they have used a series of letters in the 12th spot, and different numbers in the 13th spot, my daughters WT is A72549
Also, based on production data, they are only producing about 30,000 total for Model Year 21

Not sure if there is a good understanding of the vins yet, here is some info;


7BE5E836-4D6E-48F7-A56C-165445658F9A.jpeg
767E079C-757C-42EE-A514-38D92B379AEE.jpeg
https://www.fleet.ford.com/content/dam/aem_fleet/en_us/fleet/vin-guides/2021_VIN_Guide.pdf
Ordered: 4-Door First Edition - Rapid Red - Black Seats - MIC Top - Build Date: 10/25
In Garage: ‘62 Red Vette - ‘07 Black Shelby Ragtop - ‘21 F150 Platinum PowerBoost - Rapid Red
Kathleen, Bschurr

Rank V

Oct 24, 2021

#5
The “first Bronco” vin# 00001 was 2dr FE sold @ auction for 1.4 million for charity I believe the rest of the vins were distributed randomly. My daughter and I pretty much reserved and ordered at the same time her vin below 8000 mine 93??? Hers build BD mine BL.

Rank V

Oct 25, 2021

#6
Hm interesting, I have been wondering if the serial numbers were sequential in anyway, but doesn’t sound like it. Any ideas if the SNs have any code for trim, trans, etc

Rank VI

Oct 25, 2021

#7
I have a Nov 15 Production Date and VIN ending in B02560
OBX, 4D, Soft top, 2.7, Cyber Orange, Lux, Tow, Black Onyx
Kathleen
OBX, 4D, Soft top, 2.7, Cyber Orange, Lux, Tow, BO Leather; Order 4/3, Prod Week 11/29, Blend Date 12/1, Delivery 12/11/21

Rank III

Oct 25, 2021

#8
I have a Nov 15 Production Date and VIN ending in B02560
OBX, 4D, Soft top, 2.7, Cyber Orange, Lux, Tow, Black Onyx

When did you first submit your order?

Rank VI

Oct 25, 2021

#9
When did you first submit your order?

Hi Sdawly!
I don't understand how all this works for timing. I've been paying attention to all you long haulers with Day 1 Reservations, so feel rather guilty when I tell you:
  • I put in my reservation on 4/3/21.
  • I submitted my order at my dealership first on 8/6/21 but the ordering system was down so I was just left hanging - like so many other Bronconians.
  • My order was finally submitted and confirmed on 9/23/21.
  • Then on 9/30/21 I go THE email from Ford with my VIN and Production Scheduled for week of 11/15/21.
Part of me is nervous that the system will think I've cut the line somehow. Kind of expecting a big smack-down to send me to the back of the line and wait my turn. After all, there are tons of other folks who have been in line LONG before me.
Kathleen
OBX, 4D, Soft top, 2.7, Cyber Orange, Lux, Tow, BO Leather; Order 4/3, Prod Week 11/29, Blend Date 12/1, Delivery 12/11/21
Bike007b

Rank III

Oct 25, 2021

#10
BD 4 Door 2.7L - 11/8 build week A96500ish. Seems pretty sequential.

Rank IV

Oct 25, 2021

#11
BD 4 Door 2.7L - 11/8 build week A96500ish. Seems pretty sequential.

I’m BD 4 Door 2.7L - 11/8 build week as well with VIN A97141
Interstate

Rank III

Oct 25, 2021

#12
A80775
2dr Base, Carb Gr, 2.3L, MT, flr liners, aux switch. Res 7/24; Order 1/27; 7/21 VIN; prod 8/23; prod 8/31; prod 9/27; Delivered 12/4/21.

Rank III

Oct 25, 2021

#13
I’m BD 4 Door 2.7L - 11/8 build week as well with VIN A97141
Nice! Good luck Hoping it stays that way. Looking to contact Ford Performance Chat this week to see what my build day is. Prior build weeks have stated they were able to get this info a week to two weeks in advance.

https://performanceparts.ford.com/contact-us/
Psocci3344

Rank IV

Oct 25, 2021

#14
I’m BD 4 Door 2.7L - 11/8 build week as well with VIN A97141
Nice! Good luck Hoping it stays that way. Looking to contact Ford Performance Chat this week to see what my build day is. Prior build weeks have stated they were able to get this info a week to two weeks in advance.

https://performanceparts.ford.com/contact-us/

Good luck to you as well! We are almost there!
Keep this thread posted on how it goes, I will try and contact them too
Interstate

Rank VI

Oct 25, 2021

#15
When did you first submit your order?

Hi Sdawly!
I don't understand how all this works for timing. I've been paying attention to all you long haulers with Day 1 Reservations, so feel rather guilty when I tell you:
  • I put in my reservation on 4/3/21.
  • I submitted my order at my dealership first on 8/6/21 but the ordering system was down so I was just left hanging - like so many other Bronconians.
  • My order was finally submitted and confirmed on 9/23/21.
  • Then on 9/30/21 I go THE email from Ford with my VIN and Production Scheduled for week of 11/15/21.
Part of me is nervous that the system will think I've cut the line somehow. Kind of expecting a big smack-down to send me to the back of the line and wait my turn. After all, there are tons of other folks who have been in line LONG before me.

That is great you are getting your ride! I’m a day 3er. Waiting.
Psocci3344, Kathleen

Rank 0

Oct 25, 2021

#16
Mine is A99020, scheduled for 12/6.

Rank VI

Oct 25, 2021

#17
A92849, BL Sas 2.7 Res 7/19, ordered 1/20. week of 11/1 build date.
2021 4 door Badlands Sasquatch, Rapid red. 2.7, high package. Reserved on 07-19-2020, ordered 01-20-2021, delivered 12-05-2021

Rank II

Oct 25, 2021

#18
I have B03754, scheduled for 12/6/21. Ordered 9/14/21.

What's the difference between A's and B's?!
OBX // 4-Door // SAS // Carbonized Grey // 2.7L // Lux // Roast/Onyx Leather

GOT SNOW

Oct 25, 2021

#19
I have a Nov 15 Production Date and VIN ending in B05599
7/13 8:49 1/21 order.....
21 Badlands, 2 dr, four banger, slushbox, SAS. PERFECT!

You must log in or register to post here.