Dec 11, 2021
2021 Final Production Numbers?
TitsLaRue
Dec 11, 2021
Golfnnn54
Last edited by a moderator:
Dec 11, 2021
Dec 11, 2021
#1
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered
Storm Factor - Never Stop Chasing! BrawnCo.Club 501c3 Pending
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered
Storm Factor - Never Stop Chasing! BrawnCo.Club 501c3 Pending
TitsLaRue, BuckYeah
Dec 11, 2021
#2
- 2023 Raptor / Shadow Black / MGV (DOB 8/30/23)
- 2023 Heritage Limited Edition / Robin’s Egg Blue / 4dr / (stolen from my dealer 11/15/23)
- 2023 Heritage Limited Edition / Robin’s Egg Blue / 4dr / (stolen from my dealer 11/15/23)
ccshndl, Darrel
Dec 11, 2021
#3
Bad Lands, Sasquatch, MIC, Lux, Velocity blue
SlashRacer, HoosierDaddy
Dec 11, 2021
#4
4Dr Wildtrak, E. Green, Tow & High pkg, no MIC.
Build Week date(s): 3-7 —> 3-14
Build Week date(s): 3-7 —> 3-14
BroncOitis
Dec 11, 2021
#5
Bronco Nation Member #4410
22my | Outer Banks | Carb Grey | 2.7L V6 | MIC | LUX | Tow
22my | Outer Banks | Carb Grey | 2.7L V6 | MIC | LUX | Tow
LFlan
Dec 11, 2021
#6
Dec 11, 2021
#7
2022 4dr Badlands, 2.3L Manual, Mid pkg
YouTube: youtube.com/@ragnarkon
YouTube: youtube.com/@ragnarkon
BroncOitis, Burtoni Motors
Dec 11, 2021
#8
Gimesnow, Burtoni Motors
Dec 11, 2021
#9
Dec 11, 2021
#10
2.3, Sas BB, roof rails, aux switch’s, 8/23/20 res
HoosierDaddy, BroncOitis
Dec 11, 2021
#11
2022 Big Bend in Race Red
Dec 11, 2021
#12
*632* Days to get A 2021 - 2022 -
2023 Big Bend - 2 Door 2.3L Velocity Blue, Squatched, Mid package, Running Boards, Roof Rack, and Engine Block heater.
2023 Big Bend - 2 Door 2.3L Velocity Blue, Squatched, Mid package, Running Boards, Roof Rack, and Engine Block heater.
Lakesinai, Deano Bronc
Dec 12, 2021
#13
Dec 12, 2021
#14
MY21 2dr Black Diamond 7MT Velocity Blue!
AcesandEights, BroncOitis
Dec 12, 2021
#15
BroncOitis
Dec 12, 2021
#16
Joined May 29, 2020 Member 546
Dec 12, 2021
#17
Dec 12, 2021
#18
BroncOitis
Dec 12, 2021
#19
Day 1 res first 3 hours, Feb 6th order; May 25th? scheduled for build, July 15th Build date, Dirt Mountain 2.5 months, delivered into my loving hands Oct. 8th
BroncOitis
You must log in or register to post here.