MAP Shutdown 7/4 - 7/24

SlashRacer
Jun 10, 2022
Moderator

Defeated by Mickey’s Hot Tub

Jun 10, 2022

MAP(assembly line) will be shutdown for 3 weeks. Week of 7/4, 7/11, and 7/18.

If I was a betting man, I would bet there will be people working on the broncos that have already been built and are sitting on storage lots waiting on parts.

Hopefully those of you with your bronco on a storage lot waiting parts, will get it during or after this shutdown.

758BE589-865B-421A-BAC3-9CA0C01BF281.jpeg
2021 Badlands, 4 door, 2.7L, Auto, LUX, SAS, Tow Package, MIC, Velocity Blue.
Chief1301, Steve777468
Last edited by a moderator: Jun 10, 2022
Moderator

Defeated by Mickey’s Hot Tub

Jun 10, 2022

#1
MAP(assembly line) will be shutdown for 3 weeks. Week of 7/4, 7/11, and 7/18.

If I was a betting man, I would bet there will be people working on the broncos that have already been built and are sitting on storage lots waiting on parts.

Hopefully those of you with your bronco on a storage lot waiting parts, will get it during or after this shutdown.

View attachment 37589
My inside source confirmed they will be working on the backlog of broncos that have been built already.
2021 Badlands, 4 door, 2.7L, Auto, LUX, SAS, Tow Package, MIC, Velocity Blue.
Saccurity_Bitchez, TK1215

Burrito Connoisseur

Jun 10, 2022

#2
My inside source confirmed they will be working on the backlog of broncos that have been built already.
Heard the same from my source. Backlogged Broncos as well as retooling/training for the new 2023 Ranger which is supposed to start production May next year.

Now that I think about it… not sure why they are re-tooling so early if production isn’t supposed to start until mid-2023. But maybe it’s so they can start running test builds down the line in preparation for next year.
2022 4dr Badlands, 2.3L Manual, Mid pkg
YouTube: youtube.com/@ragnarkon
TK1215, Chief1301

Rank III

Jun 10, 2022

#3
I hope you are correct!!! My vehicle has been sitting since January (chip hold)! I really bothers me to read people getting their vehicles built after mine and delivered, but I am happy for them just not happy with the process. But I wont hold my breath thinking mine will get here any time soon.
TK1215, BroncoBill

Chief

Jun 11, 2022

#4
My inside source confirmed they will be working on the backlog of broncos that have been built already.
Great news for everyone on Dirt, Mud, Snow, Ice, or whatever the "F" Mountain! It's about time! So glad I'm not one of them! And hoping my 6/16 blend doesn't replace one of them. :unsure:
Saccurity_Bitchez, ResidualGenius

Libations MOD

Jun 11, 2022

#5
Great news for everyone on Dirt, Mud, Snow, Ice, or whatever the "F" Mountain! It's about time! So glad I'm not one of them! And hoping my 6/16 blend doesn't replace one of them. :unsure:
Freaking 879 out of 884 for the 6/16 cycle, not feeling too good about that figuring its night shift only next week doing the builds and are the end of the week.
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered
Storm Factor - Never Stop Chasing! BrawnCo.Club 501c3 Pending
Deano Bronc, Chief1301

Chief

Jun 11, 2022

#6
Freaking 879 out of 884 for the 6/16 cycle, not feeling too good about that figuring its night shift only next week doing the builds and are the end of the week.
At least 6/16 blends only have 884 to build. I saw 6/17 has 1915. What's your rotation number? 6000's or higher? I'm 617/884, rotation 4387.

Rank V

Jun 11, 2022

#7
What does the rotation number mean? I understand the blend date and the number per build cycle, but not the rotation number. Thanks for your help!
22 BB 4dr SAS 2.7 Mid Pkg Hot Pepper Red, Delivered 8/25
Previous 2019 F150 Ruby Red SCrew 3.5 Eco, XLT Sport/FX4 302A
Chief1301

Chief

Jun 11, 2022

#8
What does the rotation number mean? I understand the blend date and the number per build cycle, but not the rotation number. Thanks for your help!
Rotation numbers run from 0001 to 9999 and reset to 0001 after 9999. Supposedly the rotation number is the main number the assembly Teams are paying attention to? Rotation numbers can span across shifts and days.
Deano Bronc

Libations MOD

Jun 11, 2022

#9
At least 6/16 blends only have 884 to build. I saw 6/17 has 1915. What's your rotation number? 6000's or higher? I'm 617/884, rotation 4387.
6485 and highly doubtful that 6/17 gets 1900 done only doing one shift per day
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered
Storm Factor - Never Stop Chasing! BrawnCo.Club 501c3 Pending
Chief1301

Rank V

Jun 11, 2022

#10
What does the rotation number mean? I understand the blend date and the number per build cycle, but not the rotation number. Thanks for your help!
The rotation number goes all the way up to 9999 and cycles back around. It is used to sequence vehicles on the assembly line and is the number used by those on the line to identify what truck gets what parts.
I.e in the example above in his group they have scheduled 884 vehicles (including trucks) and his build sequence is 617 of that number.
2D Base Mansquatch: Ord 11-24-2021; VIN 3-16-2022; Schd 5/9/22; Sticker 5/4/22; Modules 5/10/22;Built 5/11/22;Shipt 5/12/22;Delv 5/24/22
Deano Bronc, frdfan

Chief

Jun 11, 2022

#11
6485 and highly doubtful that 6/17 gets 1900 done only doing one shift per day
Maybe they're adding a day shift on 6/17?

Libations MOD

Jun 11, 2022

#12
Maybe they're adding a day shift on 6/17?
Nope only running day shift this week and then night week next. No parts to run more shifts again.
FOrgot whos son works at MAP on here but B6G has several in there that work at MAP
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered
Storm Factor - Never Stop Chasing! BrawnCo.Club 501c3 Pending
Deano Bronc, Chief1301

Chief

Jun 11, 2022

#13
Nope only running day shift this week and then night week next. No parts to run more shifts again.
FOrgot whos son works at MAP on here but B6G has several in there that work at MAP
Wow, then I agree. They won't get 1900+ done on 6/17 with only one shift.

Libations MOD

Jun 11, 2022

#14
Wow, then I agree. They won't get 1900+ done on 6/17 with only one shift.
I'd like to know what a true per shift number is if they can run the shift at 100%, think it was posted early last year but that's a long time ago LOL
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered
Storm Factor - Never Stop Chasing! BrawnCo.Club 501c3 Pending
Chief1301

Chief

Jun 11, 2022

#15
I'd like to know what a true per shift number is if they can run the shift at 100%, think it was posted early last year but that's a long time ago LOL
Ross, @PREMiERdrum, a family member, or good friend of a MAP Employee? Posted on 6G last July 30th. That the total number per shift was 550. Ross provided some good inside information on 6G. Unfortunately, Ross hasn't been seen on 6G since 12/16/21. :unsure:
Deano Bronc

Libations MOD

Jun 11, 2022

#16
Ross, @PREMiERdrum, a family member, or good friend of a MAP Employee? Posted on 6G last July 30th. That the total number per shift was 550. Ross provided some good inside information on 6G. Unfortunately, Ross hasn't been seen on 6G since 12/16/21. :unsure:
MIA recon mission!!!
OUCH 550
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered
Storm Factor - Never Stop Chasing! BrawnCo.Club 501c3 Pending
Chief1301

Rank V

Jun 18, 2022

#17
I hope you are correct!!! My vehicle has been sitting since January (chip hold)! I really bothers me to read people getting their vehicles built after mine and delivered, but I am happy for them just not happy with the process. But I wont hold my breath thinking mine will get here any time soon.
That really sucks, I would imagine it being very frustrating, knowing yours is done but sitting. Very sorry, and I hope you get some good news real soon!
'22 barebones base, 4dr, non sas, softtop, 2.3 Area51.
Ordered 3/7/22, received 8/6/22 That's how you get it fast!