May 23, 2022
Arrival
HoosierVikingBear
May 23, 2022
Darrel, TK1215
Last edited by a moderator:
May 23, 2022
May 23, 2022
#1
*632* Days to get A 2021 - 2022 -
2023 Big Bend - 2 Door 2.3L Velocity Blue, Squatched, Mid package, Running Boards, Roof Rack, and Engine Block heater.
2023 Big Bend - 2 Door 2.3L Velocity Blue, Squatched, Mid package, Running Boards, Roof Rack, and Engine Block heater.
TK1215, Deano Bronc
May 23, 2022
#2
2022 Badlands 2.3M, LUX CyberO. MIC, Tow, No SQ.
Res 7/15/20, Ord 2/8/21, CEmail: 5/12, Build 5/3, Delv 5/24 680 days
Res 7/15/20, Ord 2/8/21, CEmail: 5/12, Build 5/3, Delv 5/24 680 days
TK1215, raleighrenee
May 23, 2022
#3
*632* Days to get A 2021 - 2022 -
2023 Big Bend - 2 Door 2.3L Velocity Blue, Squatched, Mid package, Running Boards, Roof Rack, and Engine Block heater.
2023 Big Bend - 2 Door 2.3L Velocity Blue, Squatched, Mid package, Running Boards, Roof Rack, and Engine Block heater.
AD BRONCO
May 23, 2022
#4
May 23, 2022
#5
4-dr Badlands 2.3L/manual, MIC, mod bumper.
7/14/20 res, Built 5/11/22, Shipped 5/13/22, Delivered 6/7/22
7/14/20 res, Built 5/11/22, Shipped 5/13/22, Delivered 6/7/22
Darrel, AD BRONCO
May 23, 2022
#6
*632* Days to get A 2021 - 2022 -
2023 Big Bend - 2 Door 2.3L Velocity Blue, Squatched, Mid package, Running Boards, Roof Rack, and Engine Block heater.
2023 Big Bend - 2 Door 2.3L Velocity Blue, Squatched, Mid package, Running Boards, Roof Rack, and Engine Block heater.
washope
May 23, 2022
#7
Darrel, AD BRONCO
May 23, 2022
#8
AD BRONCO, TechnicalDisaster
May 23, 2022
#9
'21 AMB Basesquatch 2 Door. 2.7. 569 days from reservation to delivery
Ditchrunner
May 23, 2022
#10
Bronco Nation 1100. Everglades, Desert Sand
Res: 7/30/20 ordered 1/22/21 reorder 10/15/21 changed to Everglades 3/9/22 schedule 8/29/22 bumped to 9/5; 9/7/22 blend, 9/9 Mods, 9/26/22 completed, 10/7 shipped, 11/3/22 delivery
Res: 7/30/20 ordered 1/22/21 reorder 10/15/21 changed to Everglades 3/9/22 schedule 8/29/22 bumped to 9/5; 9/7/22 blend, 9/9 Mods, 9/26/22 completed, 10/7 shipped, 11/3/22 delivery
Deano Bronc
May 23, 2022
#11
May 23, 2022
#12
2022 4dr Badlands~Cyber Orange~MIC Top~Non Sas~2.3l MT~High Package~Roof Rails~Block Heater~Ordered 1/13/22~Build date 11/3~ In production 10/26~Window sticker 10/27~11/3 Blend date~Modules live 11/4~built email 11/6~shipped 11/14~arrived at the dealership 12/13~in the home stall 12/15
May 24, 2022
#13
PSUTE, Deano Bronc
May 24, 2022
#14
2022 Badlands 2.3M, LUX CyberO. MIC, Tow, No SQ.
Res 7/15/20, Ord 2/8/21, CEmail: 5/12, Build 5/3, Delv 5/24 680 days
Res 7/15/20, Ord 2/8/21, CEmail: 5/12, Build 5/3, Delv 5/24 680 days
raleighrenee, PSUTE
May 24, 2022
#15
2022 Bronco Badlands, 4D, Hot Pepper Red, 2.7, Squatch, Lux, and MIC.
7/13/2020 10:04pm reservation. Blend 6/16/2022 Delivered 6/26/2022.
Dealership - Stephen's Auto Center.
7/13/2020 10:04pm reservation. Blend 6/16/2022 Delivered 6/26/2022.
Dealership - Stephen's Auto Center.
TangerineScream
May 24, 2022
#16
washope, Darrel
May 24, 2022
#17
Deano Bronc
May 24, 2022
#18
raleighrenee, TechnicalDisaster
May 24, 2022
#19
Sparky 22, raleighrenee
You must log in or register to post here.