Received Window Sticker- HOW MUCH LONGER?

BettyBronco
May 12, 2022

Rank 0

May 12, 2022

I received an In Production update and window sticker. I am now trying to figure out how much longer will it take to build and then to ship... can anyone guide me?
Deano Bronc
Last edited by a moderator: May 12, 2022

Rank XXXXXXVVVVVIIII

May 12, 2022

#1
can you post your windo sticker?
Deano Bronc

Adventure Day

May 12, 2022

#2
I received an In Production update and window sticker. I am now trying to figure out how much longer will it take to build and then to ship... can anyone guide me?
Look at the top of the sticker. There will be a series of numbers just above the word "BLEND." That is the date your Bronco body is scheduled to be married to the frame. Delivery is 1-2 months after that date depending on shipping and chip holds.
BettyBronco, Ditchrunner

Libations MOD

May 12, 2022

#3
weeks, months depending if you got the infamous dirt mountain tour or go straight to carrier and then if that is truck or rail
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered
Storm Factor - Never Stop Chasing! BrawnCo.Club 501c3 Pending
BettyBronco

Rank 0

May 12, 2022

#4
5/5/2022 is the date above Blend. And it lists Rail...

Adventure Day

May 12, 2022

#5
5/5/2022 is the date above Blend. And it lists Rail...
You would consider yourself lucky if you got it between now and June 5th. From June 6th through July 4th is a reasonable wait due to all the issues going on. You should be concerned if it doesn’t arrive by July 5th.

Rank IV

May 12, 2022

#6
My Window bills show a blend date of 5/5. I know it was built and shipped to the rail on 5/10. The email from Ford stated a delivery range of May 29 and June 4. The dealer did also call and confirm. Dealer stated that date ranges have been holding! The vehicle is being delivered to Colorado. Best of luck to you!

Attachments

2021 Wildtrak 4d Res Date 7/14/20, order date 2/5/21, No Build. 2022 Wildtrak 4d reorder date 10/22, VIN 3/25/22, Build 4/18/22 Actual build 5/5/22, Rail 5/10/22
Kathleen, Deano Bronc

Rank 0

May 12, 2022

#7
My window sticker says 01/26 and still no movement. The progress bar still says in production. Super frustrated at this point. Got an email a while back that just said its taking longer than expected.

Rank XXXXXXVVVVVIIII

May 13, 2022

#8
My window sticker says 01/26 and still no movement. The progress bar still says in production. Super frustrated at this point. Got an email a while back that just said its taking longer than expected.
I got the same letter it means it is on a chip hold I'm sorry I know how frustrating that is hand I there it will be worth it!
PSUTE

Rank V

May 13, 2022

#9
My window sticker says 01/26 and still no movement. The progress bar still says in production. Super frustrated at this point. Got an email a while back that just said its taking longer than expected.
Ice Mountain refugee folks...
'21 AMB Basesquatch 2 Door. 2.7. 569 days from reservation to delivery

Rank V

May 13, 2022

#10
I was a little over 2 months from blend to delivery, but I was convoy. Your results will vary...
'21 AMB Basesquatch 2 Door. 2.7. 569 days from reservation to delivery

You must log in or register to post here.