Jan 21, 2022
Ground Clearance Badlands non-squatch on 33" tires?
RdCrom86
Jan 21, 2022
Last edited by a moderator:
Jan 21, 2022
Jan 22, 2022
#1
2022 4dr Badlands~Cyber Orange~MIC Top~Non Sas~2.3l MT~High Package~Roof Rails~Block Heater~Ordered 1/13/22~Build date 11/3~ In production 10/26~Window sticker 10/27~11/3 Blend date~Modules live 11/4~built email 11/6~shipped 11/14~arrived at the dealership 12/13~in the home stall 12/15
Jan 22, 2022
#2
Jan 22, 2022
#3
Jan 22, 2022
#4
Jan 22, 2022
#5
Jan 22, 2022
#6
Jan 22, 2022
#7
2022 4dr Badlands~Cyber Orange~MIC Top~Non Sas~2.3l MT~High Package~Roof Rails~Block Heater~Ordered 1/13/22~Build date 11/3~ In production 10/26~Window sticker 10/27~11/3 Blend date~Modules live 11/4~built email 11/6~shipped 11/14~arrived at the dealership 12/13~in the home stall 12/15
Jan 22, 2022
#8
Jan 22, 2022
#9
Bronco Nation 1100. Everglades, Desert Sand
Res: 7/30/20 ordered 1/22/21 reorder 10/15/21 changed to Everglades 3/9/22 schedule 8/29/22 bumped to 9/5; 9/7/22 blend, 9/9 Mods, 9/26/22 completed, 10/7 shipped, 11/3/22 delivery
Res: 7/30/20 ordered 1/22/21 reorder 10/15/21 changed to Everglades 3/9/22 schedule 8/29/22 bumped to 9/5; 9/7/22 blend, 9/9 Mods, 9/26/22 completed, 10/7 shipped, 11/3/22 delivery
RdCrom86, Chaos
Jan 22, 2022
#10
Jan 22, 2022
#11
2021 badlands, 2.3, MT, rapid red, soft top
Deano Bronc, RdCrom86
Jan 23, 2022
#12
Jan 23, 2022
#13
BL EG 7MT 2.3L Lux O-=====-O Michigan
Order: 10/26/21, Blend: 8/8/22, Built: 8/30, Driveway: 9/20/22
Order: 10/26/21, Blend: 8/8/22, Built: 8/30, Driveway: 9/20/22
Jan 23, 2022
#14
2022 4dr Badlands~Cyber Orange~MIC Top~Non Sas~2.3l MT~High Package~Roof Rails~Block Heater~Ordered 1/13/22~Build date 11/3~ In production 10/26~Window sticker 10/27~11/3 Blend date~Modules live 11/4~built email 11/6~shipped 11/14~arrived at the dealership 12/13~in the home stall 12/15
Jan 23, 2022
#15
2022 4dr Badlands~Cyber Orange~MIC Top~Non Sas~2.3l MT~High Package~Roof Rails~Block Heater~Ordered 1/13/22~Build date 11/3~ In production 10/26~Window sticker 10/27~11/3 Blend date~Modules live 11/4~built email 11/6~shipped 11/14~arrived at the dealership 12/13~in the home stall 12/15
Jan 23, 2022
#16
Jan 23, 2022
#17
2022 4dr Badlands~Cyber Orange~MIC Top~Non Sas~2.3l MT~High Package~Roof Rails~Block Heater~Ordered 1/13/22~Build date 11/3~ In production 10/26~Window sticker 10/27~11/3 Blend date~Modules live 11/4~built email 11/6~shipped 11/14~arrived at the dealership 12/13~in the home stall 12/15
Jan 23, 2022
#18
Jan 23, 2022
#19
Shoresy
You must log in or register to post here.