Ok all you free wheeling, off-road specialists, Base Builders. Let’s get some of you posting here on the Base thread about what your reservation dates were and which one of you has the earliest scheduled build date specific to your model. And when the day finally arrives, who gets their Base to build and modify first!
bdawson24, SeaBiscuit71
Last edited by a moderator: Apr 17, 2021

Rank I

Apr 17, 2021

#1
Ok all you free wheeling, off-road specialists, Base Builders. Let’s get some of you posting here on the Base thread about what your reservation dates were and which one of you has the earliest scheduled build date specific to your model. And when the day finally arrives, who gets their Base to build and modify first!

Base 4Dr 2.7L Sasquatch
Res Date: July 17
Build date: Week of June 21 (Ford email confirmed)
VIN ends in: MLA66910
Warrior OffRD, etbowers
Moderator

Life is a Highway

Apr 17, 2021

#2
Base 4Dr 2.7L Sasquatch
Res Date: July 17
Build date: Week of June 21 (Ford email confirmed)
VIN ends in: MLA66910
Awesome! Congrats (y)

Rank IV

Apr 17, 2021

#3
Base 2dr Sasquatch 2.7L
Res date: July 18
No email. Waiting for May
mike hancho III, 14U

Home, home on the range

Apr 18, 2021

#4
Base 2dr 2.3L manual
Reserved August 7th (or 8th)
No emails (still hoping for 2021!)
2022 Bronco Black Diamond 2dr 2.3L manual Hot Pepper Red. Reserved 8/7/20. Ordered 1/23/21. Reordered 10/08/21. Scheduled week of January 24th 2022, delivered 2/24/2022
14U, Warrior OffRD

Rank V

Apr 18, 2021

#5
Chopped liver. 1st 24 hour reservation, did not get the golden ticket from my dealer. Doubt I'll get it within a year of my reservation....
'21 AMB Basesquatch 2 Door. 2.7. 569 days from reservation to delivery
Bronco Gal, TorgSurv

Rank V

Apr 18, 2021

#6
Ford could have made this a bit clearer that the APRIL 15th emails would be for the one's their dealers marked as "Priority". This Thursday should be batch for FE's and then a mystery batch for the following week to be repeated into May when supposedly everyone else gets the news on their Build Date.

Should have said April 15th, my bad.
Base 2-door, 2.3L, 7 spd, MIC Top, Oxford White, Roof Rails, Modular Bumper, Headliner, Floor Liners, Aux Switches
Build week of 2-7-22, Build 2-10-22, WS 2/18, New Blend 2/25, Built 2/27, del 3/2
bori8308, Gunninja1

Rank V

Apr 18, 2021

#7
1618771277928.png
Base 2-door, 2.3L, 7 spd, MIC Top, Oxford White, Roof Rails, Modular Bumper, Headliner, Floor Liners, Aux Switches
Build week of 2-7-22, Build 2-10-22, WS 2/18, New Blend 2/25, Built 2/27, del 3/2
SeaBiscuit71, srick76

Rank 0

Apr 19, 2021

#8
Base 2Dr 2.7L Sasquatch
Res Date: July 14 Early AM
Build date: Crickets.......
VIN ends in:
TK1215

Rank III

Apr 21, 2021

#9
Base 2Dr 2.3 7-sp manual
Res sometime last fall
Build date - Crickets, like Rubberducky 700, but I did get a notice that mine will be a MY2022. This might be good. Now that I keep hearing about MY22's permitting Sasquatch with 7-sp manuals - I think I'll change my order.

Just got the email! Looks like I can do the ManSquatch - 7sp manual with the Sasquatch package on the Base - yay! will pick a couple of other options and anxiously wait!
TK1215

Rank IV

Apr 21, 2021

#10
Base 2dr Sasquatch 2.7L
Res date: night of the launch around 10pm
No email. Waiting for May
Color white
TK1215, Allen68

Rank V

Apr 21, 2021

#11
Base 2Dr 2.3 7-sp manual
Res sometime last fall
Build date - Crickets, like Rubberducky 700, but I did get a notice that mine will be a MY2022. This might be good. Now that I keep hearing about MY22's permitting Sasquatch with 7-sp manuals - I think I'll change my order.
Mansquatch has been pushed out to '22 for months...
'21 AMB Basesquatch 2 Door. 2.7. 569 days from reservation to delivery
TK1215, Bronco Gal

Rank IV

Apr 23, 2021

#12
Base 2Dr 2.3L Auto
Res Date: July 14 Early AM
Color: Rapid Red
Mods: modular bumper, wiring harness/switches
Build date: Crickets.......
VIN ends in:
bdawson24, TK1215

Rank V

Apr 24, 2021

#13
Base 2Dr 2.3L Manual
Res. Date: October 20
Color: White
Mods: modular bumper, roof rack
Build date: TBD
Vin ends in:
Base 2-door, 2.3L, 7 spd, MIC Top, Oxford White, Roof Rails, Modular Bumper, Headliner, Floor Liners, Aux Switches
Build week of 2-7-22, Build 2-10-22, WS 2/18, New Blend 2/25, Built 2/27, del 3/2
Bronco Gal, TK1215

Rank IV

Apr 26, 2021

#14
Base, 2Dr, Sasq MIC top
Antimatter Blue
Resi: Oct 2020, Order 2/2/2021
Build date: NA
VIN: NA
2dr, Base, Sas, Eruption Green
Resi: 10/2020-->Order #1: 2/2/21 (AMB)-->Order #2: 11/2/21 (Erupt. Green)->Order #3 10/17/22 (Erupt. Green) Production 1/9/23 1/16/23. Window Sticker 1/11/23. Blend date 1/18/23. Built 1/19/2023. Shipped 1/21/23. Delivery 2/6/23. Possession 2.6.23. 849 DAYS
Howdy, TK1215

Rank III

Apr 28, 2021

#15
Base, 2Dr, 2.3 Manual
Antimatter Blue
Options: Modular Bumper w/ Brush Bar, Mud Flaps, Aux. Switches, Keyless entry, Roof Rack
Res: July 14, 2020
Build Date: TBD
VIN: TBD
TK1215

Rank II

May 02, 2021

#16
1st day reservatation and 1st day ordering Base 2.3 with 7 speed. Hope to get by Fall.
bdawson24, Stoney
Moderator

Life is a Highway

May 03, 2021

#17
1st day reservatation and 1st day ordering Base 2.3 with 7 speed. Hope to get by Fall.
Welcome aboard this crazy train!
bdawson24, Howdy

Home, home on the range

May 03, 2021

#18
Welcome to BN @Fowler. Good place to wait for the big event!
2022 Bronco Black Diamond 2dr 2.3L manual Hot Pepper Red. Reserved 8/7/20. Ordered 1/23/21. Reordered 10/08/21. Scheduled week of January 24th 2022, delivered 2/24/2022
TK1215

Rank III

May 04, 2021

#19
Base 4Dr 2.7L Sasquatch
Res Date: July 13
Build date: Week of June 28
Howdy