2021 - 11/22 CABOOSE Bronco build week!

SuzHansen
Nov 04, 2021

Bronco Nana

Nov 04, 2021

Feeling like a caboose on a very long train!!!

I got the last of the last of the last build week for 2021's. BUT.....still part of the train!

Who else? Where are you shipping too?

1636064784729.png
Upper Left, USA
4dr, Badlands, Cyber Orange, with all the fixings....and then some!
Check out my company: www.crittear.com Helping Dog Ears, Calming Dogs Fears!
Bike007b, EvlNvrDys
Last edited by a moderator: Nov 04, 2021

Libations MOD

Nov 04, 2021

#1
Still doing 21MY through the Dec 13th week now. Wouldn't surprise me if they go to the following week at the rate they are going LOL
WT HOSS 4dr 2.7 MIC Lux Tow
7/16/20 Res -- 1/22/21, 10/8/21 Order -- 3/24/22 VIN -- 5/9/22, 5/23/22, 5/16/22, 6/6/22, 6/17/22 Build 7/15/22 Delivered
Storm Factor - Never Stop Chasing! BrawnCo.Club 501c3 Pending
Darrel, SuzHansen

Rank V

Nov 04, 2021

#2
I have an 11/22 production date as well! We'll see if it sticks. Out in California - Black Diamond 4dr Area 51
SuzHansen

Rank VI

Nov 05, 2021

#3
ALL ABOARD! I'm riding the 1122 caboose, too! I'm hoping that with the MY21 VIN and a date, it'll happen this year.

Kinda cool knowing we are in the last of the batches. Oh wait...I hope this won't be like the last batch of cookies. I sometimes forget about them and they get burned. Yikes!

Shipping to Olathe, KS (KC area)
Kathleen
OBX, 4D, Soft top, 2.7, Cyber Orange, Lux, Tow, BO Leather; Order 4/3, Prod Week 11/29, Blend Date 12/1, Delivery 12/11/21
Bronco 202?, Bronco Bryan
Moderator

Life is a Highway

Nov 05, 2021

#4
You’d be like the Quad City DJ’s!
Bschurr, SuzHansen
Moderator

Life is a Highway

Nov 05, 2021

#5
One never knows what the response is going to be when you go down an obscure rabbit hole! Put that in your playlist people!
SuzHansen, Bschurr

Rank III

Nov 05, 2021

#6
11/22 here as well! Just got bumped again, 8,9,10th time? From 11/15 to 11/22. If it's the last batch, let's go! I'm so ready. My first build date was June 15th....

And I'm out in Idaho.
SuzHansen, Kathleen

Rank VI

Nov 05, 2021

#7
Congrats on getting in under the wire. It's 2022 for me, but seeing other people get their Broncos makes me happy.
jdunc04, Bronco 202?

Rank V

Nov 05, 2021

#8
The time has flown. It's already been two weeks since mine was built. I have no idea when it will arrive (trying to track the train with my dealership would be useless) but it's good to know it's on the way!

Yours will be here in the blink of an eye.
SquatchOrBust, SuzHansen

Rank V

Nov 05, 2021

#9
11/29 nor cal. First 18 he reservation 7/14. Expect it after Christmas or New Year...
JRHopp, SuzHansen

Rank III

Nov 05, 2021

#10
Feeling like a caboose on a very long train!!!

I got the last of the last of the last build week for 2021's. BUT.....still part of the train!

Who else? Where are you shipping too?

View attachment 21319
My build week is November 29th
SuzHansen, Kathleen

Rank V

Nov 05, 2021

#11
11/29 South Florida... for BL and BD
Bronco Badlands, Bronco Black Diamond, Bronco Big Bend, & Bronco Sport Badlands
www.youtube.com/1five1garage
SuzHansen, Kathleen

Rank VI

Nov 05, 2021

#12
My 2 Door OBX was to be built the week of Dec 6 was moved to Dec 13....Hoping it doesn't get pushed again. I hope to get it before my birthday or retirement.
New Mexico
2021 OBX 2 door High Package Cyber orange, second day reservation, ordered Jan 20, 2021, blend date of 18 Dec 2021, delivery date of Jan 12th and loving it.
SuzHansen, Susie Coluzzi

Rank II

Nov 05, 2021

#13
11/29 nor cal..Expect it after Christmas or New Year...
I'm 11/29 too. Colorado
richtor, SuzHansen

Rank II

Nov 05, 2021

#14
11/22 for me too! Shipping to West (that is a town), Texas.
Big Papa, RdCrom86

Rank V

Nov 05, 2021

#15
11/22 and vin for me too! Shipping to Winston-Salem, NC

4dr, 2.7L, SAS, Mid package, soft-top (convert from MIC), cyber orange.

I'm thinking it might be a new years delivery. I will be pleasantly surprised if before.
Kathleen, SuzHansen

Rank XXXXXXVVVVVIIII

Nov 05, 2021

#16
11/22 shipping to Utah
4dr badlands SAS 2.7 high package velocity blue
Bespoke Bronco, SuzHansen

Rank I

Nov 05, 2021

#17
Feeling like a caboose on a very long train!!!

I got the last of the last of the last build week for 2021's. BUT.....still part of the train!

Who else? Where are you shipping too?

View attachment 21319
Same week here too. OBX in CYBER ORANGE. South FL.
Kathleen, SuzHansen

Rank II

Nov 05, 2021

#18
Anyone get a production date on 2 door base? Ordered February 2021/ reordered 10/15.

Rank 0

Nov 05, 2021

#19
11/22, shipping to Stillwater, OK
4dr badlands non-squatch 2.7 high package - dropped tow, switched to soft 9.14.21
Reserved - 10.2.20
Converted to Order - 3.24.21
Confirmed - 4.5.21
Modified order - 9.14.21 - dropped MIC for soft, dropped tow package
Scheduled for production (11/22) & got VIN - 9.30.21
...no additional contact or updates from ford or local dealer

You must log in or register to post here.